> ## Content Index
> Fetch the complete content index at: https://www.industrialbriefs.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# McLaren Secures £1bn Data Centre Project Near M25
- URL: https://www.industrialbriefs.com/mclaren-data-centre-project-m25/
- Published: 2026-09-17T07:01:29.000Z
- Updated: 2026-09-17T07:01:28.000Z
- Description: McLaren's £1bn data centre campus near the M25 will transform a 14-acre industrial site, highlighting opportunities in data centre construction for AECM professionals.
- Author: IndustrialBriefs
- Tags: construction, engineering, sustainability

![IB_KEY_FACTS:[{"stat":"£1 billion","label":"**McLaren wins £1bn data centre project**","sublabel":"Located at Court Lane near M25, set to begin July 1."},{"stat":"140MW","label":"**Campus to add 140MW capacity**","sublabel":"Meeting demand for AI and cloud computing facilities."},{"stat":"Late 2029","label":"**Target completion date**","sublabel":"Construction expected to finish by late 2029."}]](https://industrial-briefs.ghost.io/favicon.ico)

McLaren Construction has clinched a major contract to develop a £1 billion data centre campus at Court Lane, near the M25, in collaboration with MEP specialist Phoenix ME. This project marks a significant transformation of a 14-acre industrial estate into a hyperscale data centre, addressing the growing demand for AI and cloud computing infrastructure.

**What Happened**  
The project, spearheaded by McLaren and Phoenix ME, will commence on July 1 with preliminary site works, including clearance, utility diversions, and remediation. The development will feature two expansive data centre buildings and a dedicated 140MVA substation, solidifying its place in West London’s burgeoning data centre corridor. The architectural design by Gensler, MEP design by Cundall, and engineering support from L&P Group, all contribute to the project's robust delivery team. Initial efforts will focus on relocating two major Affinity Water mains, setting the stage for comprehensive site remediation.

Julian Michalski, head of development for Corscale Europe, emphasized the tier one team's expertise in managing complex, mission-critical environments, ensuring quality and adherence to timelines. McLaren's David McDonnell highlighted the necessity of cutting-edge construction technology to meet the hyperscale project's demands. The current site, a mix of industrial uses like recycling and vehicle compounds, will be completely redeveloped by late 2029, adding 140MW of capacity to the region.

**What This Means for Your Business**  
For AECM professionals, this project underscores the growing opportunities in data centre construction, particularly in strategic locations like West London. Companies poised to engage in similar projects should enhance their capabilities in integrating advanced construction technologies and delivery techniques. The reliance on a diverse and expert team highlights the importance of collaboration in meeting complex requirements, providing a potential blueprint for future projects.

The project also reflects the critical role of utility management and remediation in large-scale developments. Firms involved in site preparation, utility relocation, and environmental remediation can find lucrative opportunities in such expansive projects. Additionally, the development aligns with the increasing demand for power-intensive facilities, driven by advancements in AI and cloud computing, suggesting a sustained market for data centre construction.

**What US Operators Should Watch**  
US operators should monitor the project's timeline, particularly the July 1 start date for preliminary works and the late 2029 completion target. Understanding the technology and collaboration strategies employed in this project can offer valuable insights for similar developments in the US. As the demand for data centres grows, keeping abreast of advancements in construction technology and utility management will be crucial for maintaining competitive positioning.

*Source: https://www.constructionenquirer.com/2026/06/03/mclaren-wins-1bn-data-centre-campus-near-m25/.* [*Read the original story ->*](https://www.constructionenquirer.com/2026/06/03/mclaren-wins-1bn-data-centre-campus-near-m25/?ref=industrialbriefs.com)