> ## Content Index
> Fetch the complete content index at: https://www.industrialbriefs.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# L&T and MHI to Develop 50km Transit System at Al Maktoum Airport
- URL: https://www.industrialbriefs.com/lt-mhi-transit-system-al-maktoum/
- Published: 2026-09-19T12:30:27.000Z
- Updated: 2026-09-19T12:30:26.000Z
- Description: L&T and MHI secure a contract to build a 50km automated people mover system at Al Maktoum Airport, enhancing connectivity and operational efficiency by 2032.
- Author: IndustrialBriefs
- Tags: construction, engineering, government

![IB_KEY_FACTS:[{"stat":"50km","label":"**Length of APM system**","sublabel":"The APM will span 50 kilometers across Al Maktoum Airport."},{"stat":"9 stations","label":"**Number of stations in APM network**","sublabel":"The system will link nine stations throughout the airport."},{"stat":"December 2031","label":"**Scheduled completion date**","sublabel":"The APM system is expected to be completed by December 2031."}]](https://industrial-briefs.ghost.io/favicon.ico)

A consortium of India's Larsen & Toubro (L&T) and Japan's Mitsubishi Heavy Industries (MHI) has been awarded the contract to design and construct a 50km-long automated people mover (APM) system at Dubai's Al Maktoum International Airport. This significant infrastructure project is part of the airport's first phase of expansion, aiming to enhance connectivity and operational efficiency by 2032.

**What Happened**  
The project, a key segment of the strategic expansion overseen by the Dubai Aviation City Corporation and Dubai Aviation Engineering Projects, will establish a fully integrated transit network within the airport. The APM system, which includes nine stations, will facilitate seamless transportation between terminals and major airport facilities. Under the contract, L&T and MHI are responsible for delivering the APM system on a turnkey basis, covering design, construction, supply, testing, commissioning, and operational readiness.

MHI, along with its subsidiary MHI-MESC, will lead the design and procurement of 165 APM vehicles and the core signaling system, while ensuring overall system integration. L&T will manage the construction of guideways, DC traction substations, power distribution, signaling, telecommunications, onboard communications, platform screen doors, and depot equipment. This collaboration highlights the technical prowess and engineering capabilities of both companies, poised to handle the complexities of such an expansive project.

Scheduled for completion in December 2031, this infrastructure development is set to significantly reduce travel times within the airport, boosting operational efficiency. The long-term vision for Al Maktoum International Airport includes handling up to 260 million passengers and 12 million tonnes of freight annually.

**What This Means for Your Business**  
For AECM professionals, this project underscores the growing opportunities in the Middle East's infrastructure sector, especially for those involved in large-scale transportation systems. The contract presents a model for future collaborations between international firms, highlighting the importance of integrating advanced technologies and system interfaces.

The project also emphasizes the need for compliance with international safety and quality standards, which are critical components when working on large infrastructure projects. Companies participating in such ventures must ensure adherence to stringent compliance requirements, including cybersecurity frameworks like CMMC and NIST, to safeguard operations and data integrity.

Additionally, this development offers insights into potential ROI and cost implications for US operators looking to engage in similar projects. Leveraging advanced technologies and efficient project execution strategies can result in substantial cost savings and improved project timelines.

**What US Operators Should Watch**  
US operators should keep an eye on the December 2031 completion deadline, as it sets a benchmark for the deployment of similar APM systems globally. Monitoring the integration of various systems and technologies in this project could provide valuable lessons for future endeavors.

Furthermore, the upcoming phases of Al Maktoum International Airport’s expansion may present further contracting opportunities. Staying informed about procurement windows and bid opportunities will be crucial for companies aiming to participate in the airport's long-term development plans.

---

*Source:* [*https://www.worldconstructionnetwork.com/news/lt-mhi-al-maktoum-airport-contract/*](https://www.worldconstructionnetwork.com/news/lt-mhi-al-maktoum-airport-contract/?ref=industrialbriefs.com)